Permalin Products is a privately held manufacturer and marketer
of book cover, book spine and specialty paper materials for the
publishing and printing industry.
In the fall of 2004, the company purchased
an old Springfield, Massachusetts warehouse location to house
the company’s manufacturing
facility. It was an exciting development for the company
but also a challenge, particularly for Glen Sullivan, a twenty-year
veteran of the company.
As facilities resource manager, Glen had the
task of preparing the 140,000 square foot facility for the fast
approaching heating season. “The building had an old oil fired boiler that
had not been properly operated and maintained while the building
was vacant, and that led to all sorts of problems, including pipes
damaged by freezing’, explained Glen. “It was
clear we needed a new heating system. And we needed it fast.”
Glen called Vic DeAngelo, his Bay State Gas Account Representative
and the process was set in motion for the installation of a new,
state of the art, high-efficiency natural gas heating system.
‘Vic quickly assessed our needs and presented an excellent
solution, the Bay State Gas, “Partners in Energy” Program.” said
Glen. As part of the program, Vic brought in RISE Engineering,
a subcontractor to the “Partners In Energy” program. RISE
conducted a complete energy assessment of the facility, the cost
being completely paid for by Bay State Gas.
The engineers came back with a comprehensive solution
that included the S-Series Blow-Thru Space Heaters from
Cambridge Engineering Inc. (see “New
Technology” in
this issue of Natural Gas Online).
The heating system, the installation costs,
and even the installation of a new, energy efficient roof were
eligible for a Bay State Gas, Partners in Energy Program rebate. “The program was
excellent. We dramatically upgraded our facility while projecting
significant energy cost savings over time for the company. Vic
and Bay State Gas helped us make a large investment in our facility
that the company would be hard-pressed to do itself.
Because the Permalin facility was an open
warehouse space that also contained four loading docks, the challenge
was to efficiently heat the building ‘evenly’ even
the dock areas. The
S-Series heaters were the right choice for the job.
These heaters provided the best solution,
offering an astonishing 90% efficiency. Plus, in contrast
to other space heating options, the S-Series heaters draw fresh
air from the outside. This
helps to keep the air inside the facility cleaner, a real plus
for a manufacturing environment. “The forced hot air
design of the system also slightly pressurized the building, providing
even heating throughout, especially in areas typically prone to
being cold spots.” said Glen.
Not only was the system an excellent decision
for Permalin Products, the service provided by Bay State Gas
was, in Glen’s opinion,
critical to the project’s success. “We knew we
needed the system shortly after we purchased the building mid-Fall. By
early winter, at the peak of the heating season, Permalin Products
was enjoying efficient, state of the art heat.” said Glen. “We
are very happy to have chosen Bay Sate Gas and the Partner in Energy
Program. Where timing was everything, it was a good fit.”